Florida electricity
2026-10 · UTC · hourly energy in MWh · EIA reporting region
Open regional slideshowDownload hourly CSV
Demand and generation
Demand 23,046,140 MWh (744/744 hours). Net generation 22,659,494 MWh (744/744 hours).
● Demand · ● Net generation · GWh per UTC day. Each point requires 24 hourly readings.
Generation by source
Monthly sums of reported hourly net generation. Storage can be negative during net charging.
| Source | Net MWh | Hours reported | Magnitude |
|---|---|---|---|
| Natural gas | 16,860,530 | 744/744 | |
| Nuclear | 2,872,194 | 744/744 | |
| Solar | 1,866,838 | 744/744 | |
| Coal | 685,085 | 744/744 | |
| Other | 299,008 | 744/744 | |
| Solar with battery storage | 56,012 | 744/744 | |
| Hydro | 15,296 | 744/744 | |
| Petroleum | 6,378 | 744/744 | |
| Battery storage | -2,039 | 744/744 |
Where the power went
Each ribbon sums hours flowing in one direction. Width uses the same MWh scale on both sides. Select a neighbor to see the same month from its side.
| Partner | Received (MWh) | Sent (MWh) | Observed hours | Hourly analysis |
|---|---|---|---|---|
| Southeast | 360,733 | 11,531 | 744/744 | View hours |
Compare & forecast · Southeast
Canada and Mexico appear as border partners where reported. Missing hours are omitted from sums. A recorded zero counts as an observation.